Shallow Mount Road Blocker
SHAR’s road blocker with a shallow foundation are designed for limiting the depth of the basement compartment underground and to avoid the main problems of laying in presence of public services such as cables ducts or drainage systems. It is built and developed by our engineering team to overcome the specific site limitations. It is designed and produced to withstand impacts at K12 level. Special design hinge structure spread on the total width of the blocker without gap and it is manufactured from heavy gauge materials.